Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

RBF - Round Butte Fish Xfer Facility

Status:   Active - Operations Unspecified
Site Type: Instream Juvenile Fish Trap  |  Organization: Portland General Electric
General Operational Period: Year Round
Start Date: 3/11/2010 11:00 AM

Round Butte Dam Fish Transfer Facility

Current Operations

Last File Loaded: RBF-2024-356-P-011.json
Date Last File Loaded: 12/21/2024 10:23 PM
Date Last File Opened: 12/21/2024 8:00 PM
Date Last File Closed: 12/21/2024 10:00 PM
Last Observation Tag: 3DD.003E1A5364
Last Observation Date: 12/12/2024 2:26 AM
Detection Summary: Last Day's Observations
Contacts

Data Steward:

Rich Madden
rich.madden@pgn.com
541-325-5364
Location
Coordinates: 44.602185, -121.280384  |  River Km: 328.177
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/1/2009
End Date:  ----
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs