Interrogation Site Metadata
RBF - Round Butte Fish Xfer Facility
Status: Active - Operations Unspecified
Site Type: Instream Juvenile Fish Trap | Organization: Portland General Electric
General Operational Period: Year Round
Start Date: 3/11/2010 11:00 AM
General Operational Period: Year Round
Start Date: 3/11/2010 11:00 AM
Round Butte Dam Fish Transfer Facility
Current Operations
Last File Loaded: | RBF-2024-330-P-009.json |
Date Last File Loaded: | 11/25/2024 6:21 PM |
Date Last File Opened: | 11/25/2024 4:00 PM |
Date Last File Closed: | 11/25/2024 6:00 PM |
Last Observation Tag: | 003.39C000001D |
Last Observation Date: | 9/30/2024 10:45 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Coordinates: 44.602185, -121.280384 | River Km: 328.177
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Select Configuration Number:
Start Date: 3/1/2009
End Date: ----
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Select Equipment Type: