Interrogation Site Metadata
PRO - Prosser Diversion Dam Combined
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 11/16/2004 11:00 AM
This site monitors the (three) fish ladders and juvenile sampling facility at Prosser Dam. Each ladder has two antennas installed at the counting window. The juvenile sampling facility has antennas installed downstream of the separator and at the exit from the sample room.
Current Operations
Last File Loaded: | PRO-2024-330-P-019.json |
Date Last File Loaded: | 11/25/2024 7:23 PM |
Date Last File Opened: | 11/25/2024 6:00 PM |
Date Last File Closed: | 11/25/2024 7:00 PM |
Last Observation Tag: | 3DD.003DF4A60B |
Last Observation Date: | 11/25/2024 2:57 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Photos Not Found
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.