Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PEL - Pelton Dam Ladder - Deschutes

Status:   Active - Operational
Site Type: Monitored Fish Release  |  Organization: Oregon Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 3/30/2016 1:00 PM

The ladder at PGE's Pelton Dam on the Deschutes River (rkm 328.161) is used as a rearing pond for spring Chinook salmon, and as a trapping facility for returning adults. This interrogation site monitors the volitional release from the ladder as well as the weirs downstream of the trap for adult trap collection of broodstock and trap-and-haul operations. It consists of two antennas located on adjacent weirs in the lower part of the ladder (for juvenile/smolt detections), and two antennas on a ladder-weir that monitor adult returns. Each antenna is a custom built loop that monitors passage at the concrete weir. The antennas for juvenile detection cover 100% of the flow as there is no flow over the top of the weir. In addition, the antennas downstream of the trap also cover 100% of the flow on one weir. The transceiver at the site is a IS-1001-MC that is networked to individual IS-1001s located near each weir. The site is operated on grid power with automated downloads daily. Typical times of operation for the juvenile antennas (Antennas 1 and 2) are from April 1 to May 30th. While the adult ladder antennas (Antennas 3 and 4) operate year-round.

Current Operations

Last File Loaded: PEL-2024-356-P-023.json
Date Last File Loaded: 12/21/2024 11:22 PM
Date Last File Opened: 12/21/2024 10:00 PM
Date Last File Closed: 12/21/2024 11:00 PM
Last Observation Tag: 3DD.003E0CBA14
Last Observation Date: 12/13/2024 10:11 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Ryan Moon
roundbuttehatchery@odfw.oregon.gov
541-325-5327

Data Steward:

Derrek Faber
Derrek.M.FABER@odfw.oregon.gov
541-296-8026
Location
Coordinates: 44.725865, -121.247167  |  River Km: 328.161
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  6/15/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs