Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PD5 - Columbia River Estuary rkm 62

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: NOAA Fisheries
General Operational Period: Seasonally
Start Date: 3/29/2023 12:00 AM

In-river detection system located at river km 62 in the Columbia River Estuary. The array (PD5) consists of up to twelve 8ft x 20ft antennas operated by NOAA Fisheries, targeting detections of migrating juvenile and adult salmonids. The array (PD5) was first installed on 3/20/2023 for continuous monitoring. The array includes a Biomark IS1001-MC transceiver, with an individual IS1001 reader assigned to each antenna. A solar panel is affixed to a steel tower mounted to a piling along the dike to charge a battery bank of four 12v marine batteries. Remote communication will be provided via a cellular modem. All electronics are contained within steel boxes affixed to the electronics tower. Antenna groups are based on orientation relative to the pile dike, with numbering starting at the downstream terminal king piling of the structure. We intend to operate this site annually from March through September.

Current Operations

Last File Loaded: PD5-2024-262-P-002.json
Date Last File Loaded: 9/23/2024 8:40 AM
Date Last File Opened: 9/16/2024 7:58 AM
Date Last File Closed: 9/18/2024 8:58 AM
Last Observation Tag: 3DD.003E18D5D2
Last Observation Date: 9/17/2024 1:16 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Paul Bentley
Paul.Bentley@noaa.gov
503-861-1818

Data Steward:

Kara Jaenecke
kara.jaenecke@noaa.gov
585-406-6278
Location
Coordinates: 46.205748, -123.431179  |  River Km: 062
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/18/2025
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

No Archived Event Logs