Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PAT - Pattit Creek Instream Site

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 3/5/2017 12:00 AM

PAT is a permanent instream PIT tag interrogation site at RKM 1.3 on Pattit Creek a tributary to the Touchet River. The site consists of two rows of one antenna each, each row spans the wetted width of the channel during base flows. The upstream row consists of 1 20-foot PVC antenna , and the lower or downstream row consists of 1 20-foot PVC antenna in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE ACN controller. The antennas were built and installed by WDFW. The electrical power at the site is provided by Columbia County Public Works Department with a 110 electrical outlet located inside the shop. A cellular modem is installed on site to provide remote communication and allow for automated data collection.

Current Operations

Last File Loaded: PAT-2024-183-P-006.json
Date Last File Loaded: 7/2/2024 4:50 AM
Date Last File Opened: 7/1/2024 11:39 PM
Date Last File Closed: 7/2/2024 2:39 AM
Last Observation Tag: 3DD.00779DD48B
Last Observation Date: 7/2/2024 12:59 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Lance Ross
Lance.Ross@dfw.wa.gov
509-382-4755

Data Steward:

Michael Herr
michael.herr@dfw.wa.gov
Location
Coordinates: 46.327536, -117.974028  |  River Km: 509.035.101.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  11/17/2016
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs