Interrogation Site Metadata
OKM - McIntyre Dam
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 7/17/2019 12:00 AM
Two pass-by antennas are mounted perpendicular to the water along the pier noses on each side of spill bay 1 at McIntyre Dam. The dam is located downstream of Vaseux Lake and upstream of Okanagan Lake. The goal is to detect upstream migrating sockeye which commonly leap over the overshot gates at the edges of the spill bay where the antennas are mounted.
Current Operations
Last File Loaded: | OKM-2024-184-P-004.json |
Date Last File Loaded: | 7/2/2024 7:20 PM |
Date Last File Opened: | 7/2/2024 1:55 PM |
Date Last File Closed: | 7/2/2024 4:55 PM |
Last Observation Tag: | 3DD.003E29A560 |
Last Observation Date: | 7/2/2024 12:19 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.