Interrogation Site Metadata
OKD - Penticton (Okanagan Lake) Dam
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 7/17/2023 12:00 PM
The site facilitates the monitoring of salmonid migration into Okanagan Lake (kłusxnitkʷ) and consists of a fish ladder antenna system and an instream array. The fishway system, installed in December 2022 on the western shore (right bank) of Okanagan Lake Dam, includes two 5 ft x 10 ft High-density Polyethylene (HDPE) antennas. The instream array, installed on August 9, 2023, approximately 80m downstream of the dam, comprises four 3 ft x 20 ft HDPE antennas in the middle and two 3 ft x10 ft HDPE antennas on each of the riverbank, covering the full 30m wetted width of the river. All antennas are connected to a Biomark IS1001 Master Controller (MC), and the site operates on alternating current (AC) power.
Current Operations
Last File Loaded: | OKD-2024-355-P-002.json |
Date Last File Loaded: | 12/20/2024 6:00 PM |
Date Last File Opened: | 12/20/2024 2:39 PM |
Date Last File Closed: | 12/20/2024 5:39 PM |
Last Observation Tag: | 3DD.003E2BF31F |
Last Observation Date: | 11/12/2024 5:52 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.