Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

NMC - Ninemile Creek Instream Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 2/12/2011 11:09 AM

Ninemile enters east side of Lake Osoyoos at Okanogan River RKM 129.5, north of the town of Oroville, WA. Site NMC is located on Ninemile Creek, 0.78 km upstream from the confluence with Lake Osoyoos. The setup consists of 3 pass-through HDPE antennas (a fourth original antenna was removed September 2019) accompanied by individual IS-1001 reader boards placed in series. All antennas are 10 feet in length, with antenna 1 the most upstream, antenna 2 the middle, and antenna 3 the downstream. The site is on grid power and regulated by an Acopian linear power supply to an MTS-MC. A bioprobe collects and stores both air and water temperatures as well as the water depth data. The NMC site has a Cloudgate 4G cellular modem which transmits data to PTAGIS through Biomark.

Current Operations

Last File Loaded: NMC-2024-117-P-002.json
Date Last File Loaded: 4/26/2024 11:30 AM
Date Last File Opened: 4/26/2024 6:38 AM
Date Last File Closed: 4/26/2024 9:44 AM
Last Observation Tag: 3DD.003D53E267
Last Observation Date: 4/26/2024 9:44 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030

Location

Coordinates: 48.970542, -119.418187  |  River Km: 858.134.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 2/12/2011 11:09 AM 1/1/2012 12:00 AM First year of operations.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/2/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
1/5/2023 10:30:00 AM SiteUp

New canbus cable installed. Site fully operational.

1/1/2023 10:00:00 PM SiteDown

Main canbus cable from MTS-MC to ACN's was severed by ice. All nodes down.

2/9/2021 2:00:00 PM General

Reinstalled new bioprobe board.

10/26/2020 4:00:00 PM SiteUp Replaced MTS-MC and Acopian Linear Power supply, removed the Bioprobe board, and added a circuit breaker between Acopian and terminal block.
10/23/2020 10:00:00 AM SiteDown A short caused multiple equipment failures, possibly by a stink bug.
9/2/2019 12:30:00 PM General Upgraded from a MUX to an IS-1001 MTS-MC and installed 3 new IS-1001 reader boards. Removed the 4 old PVC antennas, drove new T-posts and replaced with 3 new HDPE antennas in pass-through orientation.
3/9/2016 11:15:00 AM General Modem not responding. No network or signal. Modem power moved from 12v to sw12v and reset. Showing network and signal.
11/15/2014 1:00:00 AM General Unknown file gap. 
5/23/2013 1:00:00 PM General Download CR1000 and install Biomark 8.0 software
1/15/2013 2:00:00 PM General Replace battery bank A due to low voltage. Batteries at 7v. Restart system and tune antennas @ 1615

Archived Event Logs