Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

MVP - Mid-Valley Acclimation Pond

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 3/23/2012 4:10 PM

The site is installed within the outlet of the lower most pond in an off-channel pond complex on the Methow River, located at River km 87.6. The outlet is approximately .5 mi. in length with a wetted width varying from 3ft to 50 feet. The detection systems are installed in series within the outlet and are comprised of three model 2001F-ISO portable PIT detection units. The first antenna is a 24in X 24in pass through and identified as Upstream antenna 01, while second and third antennas are 9ft X 3ft pass-through antennas and identified as Middle antenna 02 and Downstream antenna 03, respectively. Upstream antenna 01 is located approximately 40 ft. upstream of Middle antenna 02, while Middle antenna 02 is approximately 15 ft. upstream of Downstream antenna 03. The interrogation systems are intended to monitor juvenile escapement, in-pond, and smolt to smolt survival. The systems are operational during juvenile acclimation. Typical times of operation for this site are March 1 to June 15.

Current Operations

Last File Loaded: MVP-2024-080-P-001.json
Date Last File Loaded: 5/16/2024 4:30 PM
Date Last File Opened: 3/20/2024 11:14 AM
Date Last File Closed: 5/13/2024 7:13 AM
Last Observation Tag: 3DD.003E0E273E
Last Observation Date: 5/27/2024 11:04 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Katie Weber
webk@yakamafish-nsn.gov
253-376-3777

Data Steward:

Danielle Grundy
grund@yakamafish-nsn.gov
Location
Coordinates: 48.504212, -120.256140  |  River Km: 843.088
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/23/2012
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs