Interrogation Site Metadata
MSB - Stansberry side channel Methow
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 8/12/2015 12:00 AM
End Date: 8/9/2017 6:15 AM
This site will be located in a side channel in the upper Methow River on river left, just below Weeman Bridge at river km 98. There will be two rows of three 20 foot long antennas at the bottom of the channel. They will be anchored in a pass-over configuration. The system will be powered by a solar panel system located on shore.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2017 | 1/1/2017 12:00 AM | 8/9/2017 6:15 AM | |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | |
2015 | 8/12/2015 12:00 AM | 1/1/2016 12:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | B0 | B1 |
Upstream Array | B0 | B2 |
Upstream Array | B0 | B3 |
Downstream Array | B0 | B4 |
Downstream Array | B0 | B5 |
Downstream Array | B0 | B6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
8/10/2017 10:00:00 AM | General | System removed from river. Will not be replaced. |
8/9/2017 10:00:00 AM | General | System removed from river. Will not be replaced. |
7/23/2016 3:03:00 AM | General | MSB antenna 1 down from 7/11/16 to 7/23/16 |
2/28/2016 12:00:00 AM | General | Antenna 1 down from 1/14/16 to 2/28/16. Cable pulled out. Only very little water flowing over one end of antenna 1. |
8/19/2015 11:24:50 AM | General | Registered new interrogation site MSB in PTAGIS. |
8/12/2015 3:00:00 PM | SiteUp | 6 antenna mux site installed and operational as of 8/12/15 at 15:00 |