Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

MSB - Stansberry side channel Methow

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Bureau of Reclamation
General Operational Period: Year Round
Start Date: 8/12/2015 12:00 AM
End Date: 8/9/2017 6:15 AM

This site will be located in a side channel in the upper Methow River on river left, just below Weeman Bridge at river km 98. There will be two rows of three 20 foot long antennas at the bottom of the channel. They will be anchored in a pass-over configuration. The system will be powered by a solar panel system located on shore.

Contacts

Primary Contact:

Grace Watson
grace@methowsalmon.org
509-997-0640

Data Steward:

Jennifer Molesworth
jmolesworth@usbr.gov
509-997-0028

Location

Coordinates: 48.532580, -120.322910  |  River Km: 843.098

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2017 1/1/2017 12:00 AM 8/9/2017 6:15 AM
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM
2015 8/12/2015 12:00 AM 1/1/2016 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/13/2015
End Date:  8/9/2017

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
8/10/2017 10:00:00 AM General System removed from river. Will not be replaced.
8/9/2017 10:00:00 AM General System removed from river. Will not be replaced.
7/23/2016 3:03:00 AM General MSB antenna 1 down from 7/11/16 to 7/23/16
2/28/2016 12:00:00 AM General Antenna 1 down from 1/14/16 to 2/28/16. Cable pulled out. Only very little water flowing over one end of antenna 1.
8/19/2015 11:24:50 AM General Registered new interrogation site MSB in PTAGIS.
8/12/2015 3:00:00 PM SiteUp 6 antenna mux site installed and operational as of 8/12/15 at 15:00

No Archived Event Logs