Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

MR1 - Minam River at river km 0.5

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Nez Perce Tribe
General Operational Period: Year Round
Start Date: 2/20/2020 12:00 AM

MR1 is a tandem array in-stream detection system located in the Minam River approximately 0.5 km upstream of the confluence of the Minam and Wallowa Rivers (lat 45.619623°, lon -117.726570°). The site is just upstream of a rotary smolt trap seasonally operated by Oregon Department of Fish and Wildlife. Streamside components including master controller, propane tanks, thermal electric generator, solar array and battery box are located on the north bank of the Minam River between the river and a large pull-out along Highway 82. A total of 10 HDPE attenae (2 sets of 5 in parallel) span 32 meters of stream. MR1 was installed in August of 2019 by Nez Perce Tribe Grande Ronde Supplementation Monitoring and Evaluation Program. MR1 began collecting data in February of 2020. Data are downloaded manually.

Current Operations

Last File Loaded: MR1-2024-183-P-001.json
Date Last File Loaded: 7/2/2024 5:03 PM
Date Last File Opened: 7/1/2024 1:17 PM
Date Last File Closed: 7/2/2024 6:19 AM
Last Observation Tag: 3DD.003E2B6F25
Last Observation Date: 7/2/2024 2:28 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Data Steward:

Brian Simmons
brians@nezperce.org
541-432-2515
Location
Coordinates: 45.619623, -117.726570  |  River Km: 522.271.131.016.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/20/2020
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs