Interrogation Site Metadata
MHP - Merwin Hydroeletric Project
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 3/3/2015 12:00 AM
The Merwin Adult Collection Facility is located at Merwin Dam. Adult fish enter the facility through the adult fish ladder where they are trapped and hoisted via an elevator into the sorting facility. Fish pass through the CWT and PIT tag readers before being discharged onto a sorting table where they are examined, possibly tagged, and sorted to one of four different destinations: downstream, hatchery surplus, hatchery broodstock, upstream of Swift reservoir.
Current Operations
Last File Loaded: | MHP-2024-330-P-002.json |
Date Last File Loaded: | 11/25/2024 9:21 AM |
Date Last File Opened: | 11/25/2024 5:46 AM |
Date Last File Closed: | 11/25/2024 6:46 AM |
Last Observation Tag: | 3DD.003E1CEAC8 |
Last Observation Date: | 11/20/2024 2:34 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.