Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

MCK - Mouth McKay Creek

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Oregon Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date:

As of April 3, 2024, four floating PIT tag antennas were installed just downstream of the McKay Creek WEIR and just upstream of where McKay Creek enters the Umatilla River. This first year, 2024, will be a pilot year to test this new antenna system in the Umatilla Basin, with the hope of gaining near 100% detection efficiency by 2025. ODFW RM&E will be releasing nearly 2000 PIT tagged hatchery steelhead just below the face of McKay Dam. The hope is to produce survival estimates to the mouth of McKay Creek and to Three Mile Falls Dam. This information will be used to determine the ability of fish to successfully navigate McKay Creek and help inform funding agency about the possible modification needed for fish passage as the ESA listed steelhead reintroduction efforts continue in the McKay Creek Watershed.

Current Operations

Last File Loaded:
Date Last File Loaded:
Date Last File Opened:
Date Last File Closed:
Last Observation Tag:
Last Observation Date:
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Stacy Remple
stacy.l.remple@odfw.oregon.gov
541-922-0660
Location
Coordinates: 45.668039, -118.840929  |  River Km: 465.082.000
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/3/2024
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs