Interrogation Site Metadata
MBD - Mill Crk Bennington Diversion
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 12/9/2021 12:00 AM
This site consists of two pass through antennas installed in the fish ladder and two pass over antennas installed in the low flow spillway of the Mill Creek Bennington Diversion dam. This site used to be part of the MCD - Mill Creek Diversion Project interrogation site that combined this location with the Mill Creek Division Works into one site. The reason this new MBD site is being created is because it is located 1.1 miles upstream from the Division Works dam, which is also a new site with code MDW.
Current Operations
Last File Loaded: | MBD-2024-356-P-005.json |
Date Last File Loaded: | 12/21/2024 11:22 PM |
Date Last File Opened: | 12/21/2024 7:46 PM |
Date Last File Closed: | 12/21/2024 10:46 PM |
Last Observation Tag: | 3DD.003DEA6B35 |
Last Observation Date: | 12/19/2024 10:02 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.