Interrogation Site Metadata
LOR - Lost River at rkm 0.81
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 3/22/2013 12:00 AM
End Date: 8/18/2017 11:00 AM
This site is a permanent instream PIT tag detection system located at rkm 0.81 on the Lost River (Methow River Basin), located near the Lost River Airport. The site consists of two rows of three 20-foot antennas. All antennas are installed in flat plate configuration. Each row of antennas spans the wetted width of the channel during base flows. The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. A Campbell Scientific CR-1000 data logger and cellular modem are installed on site to automate data collection and provide remote communication. A water temperature and pressure probe, and an air temperature probe are also installed on site to monitor environmental conditions. Site removed August 2017.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2017 | 1/1/2017 12:00 AM | 8/18/2017 11:00 AM | Site shut down August 18 and equipment removed with no plans to reinstall. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 3/22/2013 12:00 AM | Antennas F2 and F3 funtioning poorly or not at all from March 22-July 17 when both were replaced. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | F0 | F1 |
Upstream Array | F0 | F2 |
Upstream Array | F0 | F3 |
Downstream Array | F0 | F4 |
Downstream Array | F0 | F5 |
Downstream Array | F0 | F6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
8/18/2017 11:00:00 AM | SiteDown | On 8/18/2017 at approximately 11:00 the Lost River interrogation site was shut off and the equipment will be removed. |
5/21/2013 11:54:55 AM | General | Initial event log for site LOR. Todd Miller (todd.miller@dfw.wa.gov) is the data steward. Ben Truscott (ben.truscott@dfw.wa.gov) is the technical POC. |