Interrogation Site Metadata
LLC - Loup Loup Creek Instream Array
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 3/7/2013 12:00 AM
LLC is a permanent PIT Tag interrogation system on Loup Loup Creek. Loup Loup Creek enters the Okanogan River at RKM 27.2, within the city of Malott, WA. LLC is located 0.42 km from the confluence with the Okanogan River. In June 2013, the site consisted of 3 PVC antennas anchored to the stream bed in pass-over configuration. In January 2018, the instream array was reconfigured with three 10 foot HDPE pipe antennas anchored to the stream bed for pass-over detection. Antennas are configured in 3 separate rows that span the wetted width at base flow. Each antenna is power by a Biomark IS1001 reader multiplexed by an IS1001-MC. The site is on grid power running a linear power supply that in turn powers the detection system. LLC has remote communication abilities provided by a cellular modem.
Current Operations
Last File Loaded: | LLC-2024-110-P-006.json |
Date Last File Loaded: | 4/20/2024 3:11 AM |
Date Last File Opened: | 4/19/2024 8:32 PM |
Date Last File Closed: | 4/19/2024 11:52 PM |
Last Observation Tag: | 3DD.003D8C54AD |
Last Observation Date: | 4/19/2024 11:52 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 3/7/2013 12:00 AM | 1/1/2014 12:00 AM | Antennas changed from pass-thru to flat plate configuration on June 26. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | D0 | 01 |
Middle Antenna | D0 | 02 |
Downstream Antenna | D0 | 03 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to the Event Logs.
Event Date | Event Type | Comments |
---|---|---|
1/9/2023 3:00:00 PM | General |
Found source of shorting issue. Replaced ACN #3 and all nodes are fully operational. |
1/5/2023 11:30:00 AM | SiteUp |
Troubleshot node malfunction issue. Found a short in system. Was able to get Node 1 to function. Site is back up and running, however only antenna 1 is currently working. |
1/1/2023 11:30:00 AM | SiteDown |
A short in the cabling caused all nodes to become inoperable. |
1/30/2018 7:42:00 AM | General | Installed three 10 foot HDPE antennas anchored to the stream bed for pass-over detection. Each antenna is power by a IS1001 reader housed in a canister also anchored to the stream bed. All readers are multiplexed through a single canbus cable connected to a newly installed IS1001-MC. |
11/28/2017 12:00:00 PM | General | Installed new instream anchors for antennas 1-3. |
10/17/2017 12:00:00 PM | General | Installed AC to DC power converter. |
6/26/2017 12:00:00 PM | SiteUp | Antennas 1 and 2 reinstalled in stream. |
4/9/2017 8:32:00 AM | SiteDown | High flow caused substantial stream bed incision eroding instream anchors, antennas were washed downstream. |
7/7/2016 12:00:00 AM | General | 7/7-7/12. Reset antennas 1-3. Remove excess all-thread, change straps and re-rock. |
9/3/2015 10:01:58 AM | General | Charger error. Cycle charger. |
9/1/2015 2:00:00 PM | General | Charger error. Cycle charger. |
8/29/2015 6:00:00 PM | General | Charger error. Cycle charger. |
8/26/2015 10:30:00 AM | General | Charger error. Cycle charger. |
8/19/2015 12:15:00 PM | General | Charger error. Cycle charger. |
8/12/2015 10:00:00 AM | General | Charger error. Cycle charger. |
8/6/2015 9:30:00 AM | General | Charger error. Cycle charger. |
8/3/2015 12:00:00 PM | General | Charger error. Cycle charger. |
7/31/2015 12:00:00 PM | General | System ok. Change switcher timer from 4 hours to 2 hours to help increase charging. |
7/30/2015 4:30:00 PM | General | System voltage drop. Charger error. Cycle charger. |
3/22/2015 6:00:00 PM | General | System not uploading. Reset modem. |
12/14/2014 5:00:00 AM | General | Unknown file gap. |
11/22/2013 11:00:00 AM | General | Install VM to monitor system through CR1000 |
6/26/2013 8:00:00 AM | General | Reinstall all antennas in flat plate configuration. Reset MUX ~1230 |
5/22/2013 4:00:00 PM | General | New switcher and 5 amp charger installed. MUX reset. |
5/21/2013 3:00:00 PM | General | Switcher popped/fried. Blew 15 amp fuse. |