Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LLC - Loup Loup Creek Instream Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 3/7/2013 12:00 AM

LLC is a permanent PIT Tag interrogation system on Loup Loup Creek. Loup Loup Creek enters the Okanogan River at RKM 27.2, within the city of Malott, WA. LLC is located 0.42 km from the confluence with the Okanogan River. In June 2013, the site consisted of 3 PVC antennas anchored to the stream bed in pass-over configuration. In January 2018, the instream array was reconfigured with three 10 foot HDPE pipe antennas anchored to the stream bed for pass-over detection. Antennas are configured in 3 separate rows that span the wetted width at base flow. Each antenna is power by a Biomark IS1001 reader multiplexed by an IS1001-MC. The site is on grid power running a linear power supply that in turn powers the detection system. LLC has remote communication abilities provided by a cellular modem.

Current Operations

Last File Loaded: LLC-2024-330-P-004.json
Date Last File Loaded: 11/25/2024 5:40 PM
Date Last File Opened: 11/25/2024 1:12 PM
Date Last File Closed: 11/25/2024 4:12 PM
Last Observation Tag: 3DD.003D53DA33
Last Observation Date: 11/24/2024 10:41 PM
Detection Summary: Last Day's Observations
Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030
Location
Coordinates: 48.283501, -119.708240  |  River Km: 858.028.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/30/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Archived Event Logs