Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LD3 - Lebanon Dam Diversion Bypass

Status:   Active - Operational
Site Type: Juvenile Fish Bypass Facility  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 4/30/2015 12:00 AM

Two-antenna array mounted on the Lebanon dam diversion bypass pipe at Lebanon dam on the South Santiam River, a tributary to the Willamette River. The bypass pipe diverts fish around the dam and empties back into the river. Each antenna is connected to a Biomark IS1001 reader. The site is powered by four batteries connected to a battery switcher. The batteries are charged by on-site AC power. The data is collected with a cell modem. The site was originally operated by ODFW from 2015-2018 and was reinstalled in 2022.

Current Operations

Last File Loaded: LD3-2024-116-P-005.json
Date Last File Loaded: 4/25/2024 8:40 PM
Date Last File Opened: 4/25/2024 3:39 PM
Date Last File Closed: 4/25/2024 6:48 PM
Last Observation Tag: 3DD.003BD578DD
Last Observation Date: 4/24/2024 3:54 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Fenton Khan
fenton.o.khan@usace.army.mil
503-808-4777

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 44.515356, -122.862182  |  River Km: 163.174.019.032

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 10/4/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 11/15/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 4/30/2015 12:00 AM 1/1/2016 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/4/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
10/4/2022 12:30:00 PM SiteUp

Site operational as of 10/04/2022 @ 1230PST.

11/30/2018 3:43:00 PM General Site up, but no longer visited regularly to download data. Data updates will be sporadic, and could be a year or longer between updates.
8/17/2016 12:00:00 AM SiteUp System operational, high noise on antenna 1
5/2/2016 12:00:00 AM SiteDown System down
12/3/2015 12:00:00 AM General Antenna 1 operating again but with high noise
11/28/2015 12:00:00 AM General Antenna 1 down
10/22/2015 12:00:00 AM General Antenna 1 down today only
10/21/2015 12:00:00 AM SiteUp System operational
10/17/2015 12:00:00 PM SiteDown Battery switcher blew transformer. Likely operated for two days on batteries before running out of power. Will switch battery switcher this Wednesday, 10/21 during site visit.
7/30/2015 10:43:00 AM General Registered new site LD3 in PTAGIS.

No Archived Event Logs