Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LD1 - Lebanon Dam South Ladder

Status:   Active - Non-Operational
Site Type: Adult Fishway  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 5/27/2015 12:00 AM

Two instream arrays installed in the south fish ladder at Lebanon dam on the South Santiam River, a tributary to the Willamette River. The upstream array consists of three externally shielded pass-through antennas located at the ladder exit and the downstream array consists of two internally shielded pass-through antennas covering the ladder orifices of weir 7 and one unshielded cord antenna covering the center slot of weir 7. The antennas are powered by a Biomark Master Controller and IS1001 readers. The site is powered by AC power and data is collected using a cell modem. The site was originally operated by ODFW from 2015-2018 and was reinstalled in 2022.

Current Operations

Last File Loaded: LD1-2024-356-P-005.json
Date Last File Loaded: 12/21/2024 8:40 PM
Date Last File Opened: 12/21/2024 4:50 PM
Date Last File Closed: 12/21/2024 7:50 PM
Last Observation Tag: 3DD.0078EEE6DD
Last Observation Date: 11/13/2024 4:37 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Fenton Khan
fenton.o.khan@usace.army.mil
503-808-4777

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446
Location
Coordinates: 44.516100, -122.862744  |  River Km: 163.174.019.032
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/22/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs