Interrogation Site Metadata
KEN - Kenney Creek In-stream Arrays
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 6/1/2010 12:00 AM
In-stream detection system consisting of two 20ft x 3ft HDPE pipe antennas connected to standalone Biomark IS1001 readers. The site is located on Kenney Creek approximately 400-meters upstream of the confluence with the Lemhi river and is powered by photovoltaic solar. The site was originally installed approximately 300 meters downstream of its current location, but was moved in September 2015 to a temporary location 60 meters upstream of its current location. The site did not operate between December 2015 and June 2018, when it was reinstalled with its current equipment.
Current Operations
Last File Loaded: | KEN-2024-356-P-005.json |
Date Last File Loaded: | 12/21/2024 11:00 PM |
Date Last File Opened: | 12/21/2024 6:50 PM |
Date Last File Closed: | 12/21/2024 9:53 PM |
Last Observation Tag: | 3DD.0077D9325F |
Last Observation Date: | 11/23/2024 10:17 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.