Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

JPT - Juvenile Pond Touchet

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 7/12/2016 12:00 AM

JPT is a permanent instream PIT tag interrogation site at RKM 87.5 on the Touchet river. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of 3 20 foot x 3 foot HDPE antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark Multiplexing Reader IS1001-MC Master Controller. The antennas were built and installed by WDFW. The electrical power at the site is provided by Washington Department of fish and Wildlife with a 110 electrical outlet located at the Touchet Adult Trap upstream. Data will be downloaded by Biomark through a cell modem. No environmental monitors are installed at this time.

Current Operations

Last File Loaded: JPT-2024-356-P-005.json
Date Last File Loaded: 12/21/2024 8:40 PM
Date Last File Opened: 12/21/2024 4:12 PM
Date Last File Closed: 12/21/2024 7:53 PM
Last Observation Tag: 3DD.0078C51584
Last Observation Date: 12/21/2024 7:53 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Lance Ross
Lance.Ross@dfw.wa.gov
509-382-4755

Data Steward:

Michael Herr
michael.herr@dfw.wa.gov
Location
Coordinates: 46.313717, -117.975088  |  River Km: 509.035.087
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/7/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs