Interrogation Site Metadata
JPT - Juvenile Pond Touchet
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 7/12/2016 12:00 AM
JPT is a permanent instream PIT tag interrogation site at RKM 87.5 on the Touchet river. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of 3 20 foot x 3 foot HDPE antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark Multiplexing Reader IS1001-MC Master Controller. The antennas were built and installed by WDFW. The electrical power at the site is provided by Washington Department of fish and Wildlife with a 110 electrical outlet located at the Touchet Adult Trap upstream. Data will be downloaded by Biomark through a cell modem. No environmental monitors are installed at this time.
Current Operations
Last File Loaded: | JPT-2024-105-P-012.json |
Date Last File Loaded: | 4/18/2024 4:31 PM |
Date Last File Opened: | 4/14/2024 7:26 PM |
Date Last File Closed: | 4/14/2024 8:59 PM |
Last Observation Tag: | 3DD.003D458E0E |
Last Observation Date: | 4/14/2024 8:59 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/3/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 7/3/2018 12:00 AM | 8/19/2018 12:00 AM | Site reinstalled June 27-July 3 with four new 20ft antennas and IS1001-MTS. Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 2/13/2017 12:00 AM | Site damaged by high ice flows in February and no data receieved after that. |
2016 | 7/12/2016 12:00 AM | 1/1/2017 12:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | D0 | D1 |
Upstream Array | D0 | D2 |
Upstream Array | D0 | D3 |
Downstream Array | D0 | D4 |
Downstream Array | D0 | D5 |
Downstream Array | D0 | D6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
9/26/2023 10:00:00 AM | SiteUp |
Site was started up today. |
6/30/2023 10:00:00 AM | SiteDown |
Site shut down for the summer due to construction, will be restarted in September. |
6/30/2023 8:00:00 AM | SiteDown |
Site was shut down on 6/30/23. It is scheduled to turn back on in September. |
10/7/2022 11:38:00 AM | SiteUp | Site was re-installed with 2 additional antennas. 6 total |
5/9/2022 12:00:00 AM | SiteDown |
Site down due to high flows, site will be re-installed during the summer |
8/2/2021 12:00:00 PM | General |
Site installed down stream from last year. Now running 4 antennas. |
7/6/2021 8:00:00 AM | SiteUp |
Site is back up and running |
6/29/2021 8:00:00 AM | SiteDown |
Site turned off for a few days for construction in the area. |
12/11/2020 9:00:00 AM | SiteUp | Re-installed antennas 1 and 2 only. |
10/22/2020 12:35:15 PM | SiteDown | Site is pulled from the river while the Corp of Engineers is working on the dike. |
10/13/2020 9:00:00 AM | SiteUp | Site turned back on. |
9/29/2020 2:00:00 PM | SiteDown | Site turned off while the county road department is working clearing debris along river banks. |
7/15/2020 10:00:00 AM | SiteUp | Site re-installed and running, site now has 6 antennas |
2/7/2020 7:12:00 AM | SiteDown | Site down due to flood waters. |
8/1/2019 7:09:00 AM | General | Installed Pod #4. Site completely up and running. |
7/29/2019 7:09:00 AM | General | Reset modem |
7/25/2019 7:09:00 AM | SiteUp | Turned site on with antennas 1, 2 and 3 |
7/23/2019 7:09:00 AM | General | Re-installed antennas |
4/10/2019 10:00:00 AM | SiteDown | Site is down due to high stream flows taking out the antennas, it will be fixed this summer when we reach summer time flows |
7/3/2018 8:49:00 AM | SiteUp | On 6/27/18 the array was upgraded with 4 HDPE WDFW built antennas in a 2 X 2 pass over configuration. All antennas are 20'. 4 IS1001s in pods were installed. On 7/03/18 the reader was replaced with an IS1001 MTS and the wiring was completed. All antennas were operating at full potential. |
6/20/2017 1:19:21 PM | General | • Juvenile Pond Touchet (JPT) – Site visit January 3th and January 27th .Download of MUX and data sent. February 13 antenna’s 2,3,5, & 6 are out due to high ice flows. I did a buffer download 2/13/2017. February 20th continued flood like river discharge has damaged or destroyed most of the site making any repair problematic at this time. June 19th repairs are ongoing and should be completed this summer. |