Interrogation Site Metadata
JD1 - John Day River, McDonald Ferry
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 9/27/2007 12:00 AM
John Day River in-stream detection, near McDonald Ferry at RM 20
Current Operations
Last File Loaded: | JD1-2024-088-P-005.json |
Date Last File Loaded: | 3/28/2024 10:50 PM |
Date Last File Opened: | 3/28/2024 6:29 PM |
Date Last File Closed: | 3/28/2024 9:29 PM |
Last Observation Tag: | 3DD.003D6EA537 |
Last Observation Date: | 3/27/2024 2:48 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on file open and close dates. File gap March 17 - September 16. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on file open and close dates. |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | Start and end dates based on file open and close dates. |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | Start and end dates based on file open and close dates. |
2012 | 5/1/2012 12:00 AM | 1/1/2013 12:00 AM | Start and end dates based on file open and close dates. |
2011 | 1/1/2011 12:00 AM | 10/3/2011 12:00 AM | Start and end dates based on file open and close dates. |
2010 | 1/1/2010 12:00 AM | 1/1/2011 12:00 AM | Start and end dates based on file open and close dates. |
2009 | 1/1/2009 12:00 AM | 1/1/2010 12:00 AM | Start and end dates based on file open and close dates. |
2008 | 1/1/2008 12:00 AM | 1/1/2009 12:00 AM | Start and end dates based on file open and close dates. |
2007 | 9/27/2007 12:00 AM | 1/1/2008 12:00 AM | Start and end dates based on file open and close dates. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | D1 | 01 |
Upstream Array | D1 | 02 |
Upstream Array | D1 | 03 |
Upstream Array | D1 | 04 |
Upstream Array | D1 | 05 |
Upstream Array | D1 | 06 |
Downstream Array | D1 | 07 |
Downstream Array | D1 | 08 |
Downstream Array | D1 | 09 |
Downstream Array | D1 | 0A |
Downstream Array | D1 | 0B |
Downstream Array | D1 | 0C |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
10/23/2020 8:00:00 AM | General | Installed two additional 45 ft cord antennas on the upstream array. These antennas each span the width of two 20 ft antennas, and were placed on top of existing antennas. Therefore the IS-1001 at Antenna 6 now interrogates the same width as 5 & 6 combined, and Antenna 4 spans the same width as 3&4 combined. |
4/4/2018 4:15:00 PM | SiteUp | Site Up. Node short caused MC to shut off. Unplugged Data cable to three nodes (antennas 4,5,6). Site back up on 4/4/2018 at 16:15, minus the three antennas. |
3/29/2018 10:37:00 PM | SiteDown | Site Down. Node short caused MC to shut off. Unplugged Data cable to three nodes (antennas 4,5,6). Site back up on 4/4/2018 at 16:15, minus the three antennas. |
8/31/2017 2:35:00 PM | SiteUp | As of about noon, JD1 has all 12 antennas operating on a MTS system. Two full arrays. All nodes and MTS updated to latest firmware (1.6.2). Automated downloads are forthcoming, with manual downloads in the meantime. |
7/25/2017 10:38:00 AM | SiteUp | Activated upstream array. Antennas 1-5 active, antenna 6 was damaged by Fire operations at McDonald Ferry sometime in June. Replacement needed. Antennas 1-5 now on Biomark Master Controller fwv 1.6.1. Downstream array still active as well, and operating on Qube system. These antennas to be moved onto Master Controller in the coming months. |
10/22/2013 10:10:50 AM | General | Updated PTAGIS configuration to include antennas installed on 8/16. |
9/30/2013 2:30:00 PM | General | CANbus cable for antennas 07 - 0C was moved down stream and anchored away from the antennas to reduce the apparent ground loop, thus raising antenna current. |
9/19/2013 2:30:00 PM | General | Antennas 01-05 were disconnected. An apparent ground loop was causing low antenna current. Antenna 06 is the only active upstream antenna. Antennas 07 - 0C are the downstream array which spans from bank to bank at lower water levels. |
8/16/2013 2:30:00 PM | General | FS1001M was replaced by an IS1001-MTS. Twelve antennas were installed and active (01 - 0C). Antennas 01-06 upstream, 07-0C downstream). |