Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

IML - Imnaha River Weir Adult Ladder

Status:   Active - Operational
Site Type: Adult Fishway  |  Organization: Oregon Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 5/18/2015 12:00 AM

The site is located at the Oregon Dept. of Fish and Wildlife (ODFW) fish weir on the Imnaha River. The site was initially installed with two antennas in the ladder; a third antenna was added in June 2018 to monitor all fish handled in the work room at the trap. The antennas are currently driven by Biomark IS1001s and controlled by a Biomark IS1001-MC. The equipment is powered by a Hybrid- TEG (model 5220 and 1kw solar). The readers are connected to the controller via Biomark Data-Over-Power (DOP) cabling. The MC is connected to a satellite modem for remote telemetry. The site is being remotely monitored by Biomark with automatic downloads (and PTAGIS submissions) every four hours. The power supply and remote telemetry are being shared by the three interrogation sites at the weir, IR4, IR5, and IML.

Current Operations

Last File Loaded: IML-2024-184-P-004.json
Date Last File Loaded: 7/2/2024 7:40 PM
Date Last File Opened: 7/2/2024 2:02 PM
Date Last File Closed: 7/2/2024 5:49 PM
Last Observation Tag: 3DD.003D9F8E86
Last Observation Date: 7/2/2024 5:49 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Derrek Faber
Derrek.M.FABER@odfw.oregon.gov
541-296-8026

Data Steward:

Joseph Feldhaus
joseph.feldhaus@odfw.oregon.gov
541-962-3724
Location
Coordinates: 45.194276, -116.868663  |  River Km: 522.308.084
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  6/27/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

No Archived Event Logs