Interrogation Site Metadata
ICU - Upper Icicle Instream Array
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 4/20/2015 12:00 AM
ICU is a permanent instream PIT tag interrogation site at RKM 10 on Icicle Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of three 20-foot PVC/HDPE antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001 controller. The antennas were built and installed by WDFW. The site is connected to grid power. Site was shut down in May 2023, until funding was found to update equipment in late July of 2024. Array may be turned off during winter months.
Current Operations
Last File Loaded: | ICU-2024-299-P-001.json |
Date Last File Loaded: | 11/12/2024 10:40 AM |
Date Last File Opened: | 10/25/2024 6:44 PM |
Date Last File Closed: | 11/7/2024 11:44 AM |
Last Observation Tag: | 3DD.003E464494 |
Last Observation Date: | 8/17/2024 7:50 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.