Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

HSU - Hancock Springs Upper

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/17/2013 12:00 AM
End Date: 1/6/2016 12:00 AM

This is the upper-most interrogator on Hancock Springs creek. It is located directly downstream of the fence separating the restored reach form the un-restored reach. The array consists of two pass-thru antennas designated A1 (upstream), and A2 (downstream).

Contacts

Primary Contact:

Teresa Fish
fist@yakamafish-nsn.gov
509-314-1462

Data Steward:

John Jorgensen
jorj@yakamafish-nsn.gov
509-670-7298

Location

Coordinates: 48.534604, -120.333895  |  River Km: 843.097.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2016 1/1/2016 12:00 AM 1/6/2016 12:00 AM No data recieved.
2015 3/3/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 11/19/2014 12:00 AM Site down January 17-March 5, April 17-29. Antennas up and down intermittently, see event log for details.
2013 4/17/2013 12:00 AM 1/1/2014 12:00 AM Site down September 15-November 18, December 11-19, December 20-30. Antennas up and down intermittently, see event log for details.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/17/2013
End Date:  1/6/2016

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
12/30/2015 2:00:00 PM General New batteries
12/16/2015 2:07:00 PM General New batteries at site (only powering A2)
12/9/2015 2:17:00 AM SiteDown A1 down - temperature issues, compactFlash disk no longer recording data
9/24/2015 2:00:00 PM General Installed 2 additional solar panels
3/3/2015 1:00:00 PM SiteUp Installed new batteries, A1 and A2 up and running
11/19/2014 12:00:00 AM SiteDown A1 and A2 down
4/29/2014 3:00:00 PM SiteUp A1 and A2 up
4/17/2014 7:00:00 AM SiteDown A2 down
4/10/2014 8:00:00 AM SiteDown A1 down
3/5/2014 3:00:00 PM SiteUp A2 up at 1500, A1 up at 1900
1/17/2014 3:00:00 AM SiteDown A1 down
1/16/2014 4:00:00 AM SiteDown A2 down
1/9/2014 6:00:00 PM SiteUp A1 up
12/30/2013 3:00:00 PM SiteUp A2 up
12/20/2013 1:00:00 AM SiteDown A1 and A2 down
12/19/2013 6:00:00 PM SiteUp A1 up at 1800, A2 up at 1900
12/11/2013 10:00:00 PM SiteDown A1 and A2 down
12/10/2013 6:00:00 PM SiteUp A1 up
12/4/2013 4:00:00 AM SiteDown A1 down
11/18/2013 1:00:00 PM SiteUp A1 and A2 up
9/15/2013 8:00:00 AM SiteDown A1 and A2 down
8/28/2013 7:00:00 PM SiteUp A1 up
7/18/2013 3:00:00 PM SiteUp A2 up
7/18/2013 3:00:00 PM SiteDown A1 down
7/11/2013 10:00:00 PM SiteUp A1 up

Archived Event Logs