Interrogation Site Metadata
HSL - Hancock Springs Lower
Status: DecommissionedGeneral Operational Period: Seasonally
Start Date: 4/17/2013 12:00 AM
End Date: 1/6/2016 12:00 AM
This interrogator is located in Hancock Springs creek, directly upstream of its confluence with the Methow River. The array consists of two pass-thru antennas designated C1 (upstream) and C2 (downstream).
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2016 | 1/1/2016 12:00 AM | 1/6/2016 12:00 AM | No data recieved. |
2015 | 4/6/2015 12:00 AM | 12/27/2015 12:00 AM | |
2014 | 3/17/2014 12:00 AM | 6/26/2014 12:00 AM | Site down June 26. Antennas up and down intermittently, see event log for details. |
2013 | 4/17/2013 12:00 AM | 9/4/2013 12:00 AM | Site down July 2-September 4. Site operated breifly on September 4, then was offline the rest of the year. Antennas up and down intermittently, see event log for details. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Hancock Springs 03 | C1 | C1 |
Hancock Springs 03 | C1 | C2 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
1/6/2016 1:15:00 PM | SiteUp | C1 and C2 up and running with new batteries |
12/27/2015 10:25:00 AM | SiteDown | C1 and C2 down - low battery |
12/17/2015 12:37:00 PM | SiteUp | C1 and C2 up and running - new batteries |
11/19/2015 2:02:00 AM | SiteDown | C1 and C2 down - low battery |
11/4/2015 1:00:00 PM | General | New bateries |
9/10/2015 1:00:00 PM | General | Installed 2 additional solar panels |
6/26/2015 11:53:00 PM | SiteUp | C1 and C2 up |
6/14/2015 3:03:00 AM | SiteDown | C1 and C2 down, low battery |
4/6/2015 1:55:00 PM | SiteUp | C1 and C2 up and running with new batteries |
6/26/2014 2:01:00 AM | SiteDown | C1 down |
6/24/2014 11:45:00 PM | SiteDown | C2 down |
4/29/2014 7:00:00 AM | SiteUp | C1 up |
4/10/2014 2:00:00 AM | SiteDown | C1 down |
4/9/2014 3:00:00 PM | SiteUp | C2 up |
4/1/2014 5:00:00 AM | SiteDown | C2 down |
3/17/2014 6:00:00 AM | SiteUp | C1 up at 0600, C2 up at 0700 |
9/4/2013 7:00:00 PM | SiteDown | C2 down at 1900, C1 down at 2000 |
9/4/2013 2:00:00 PM | SiteUp | C2 up at 1400, C1 up at 1900 |
7/2/2013 11:00:00 AM | SiteDown | C2 down |
6/21/2013 1:56:38 PM | General | Initial event log. John Jorgensen (jorj@yakamafish-nsn.gov) is the site data steward. Daniel Russell (rusd@yakamafish-nsn.gov) is technical POC. |
5/9/2013 12:00:00 AM | SiteDown | C1 down |
4/17/2013 10:00:00 PM | SiteUp | C1 and C2 up and running for the first time |