Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

HSL - Hancock Springs Lower

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/17/2013 12:00 AM
End Date: 1/6/2016 12:00 AM

This interrogator is located in Hancock Springs creek, directly upstream of its confluence with the Methow River. The array consists of two pass-thru antennas designated C1 (upstream) and C2 (downstream).

Contacts

Primary Contact:

Teresa Fish
fist@yakamafish-nsn.gov
509-314-1462

Data Steward:

John Jorgensen
jorj@yakamafish-nsn.gov
509-670-7298

Location

Coordinates: 48.531648, -120.324021  |  River Km: 843.097.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2016 1/1/2016 12:00 AM 1/6/2016 12:00 AM No data recieved.
2015 4/6/2015 12:00 AM 12/27/2015 12:00 AM
2014 3/17/2014 12:00 AM 6/26/2014 12:00 AM Site down June 26. Antennas up and down intermittently, see event log for details.
2013 4/17/2013 12:00 AM 9/4/2013 12:00 AM Site down July 2-September 4. Site operated breifly on September 4, then was offline the rest of the year. Antennas up and down intermittently, see event log for details.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/17/2013
End Date:  1/6/2016

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
1/6/2016 1:15:00 PM SiteUp C1 and C2 up and running with new batteries
12/27/2015 10:25:00 AM SiteDown C1 and C2 down - low battery
12/17/2015 12:37:00 PM SiteUp C1 and C2 up and running - new batteries
11/19/2015 2:02:00 AM SiteDown C1 and C2 down - low battery
11/4/2015 1:00:00 PM General New bateries
9/10/2015 1:00:00 PM General Installed 2 additional solar panels
6/26/2015 11:53:00 PM SiteUp C1 and C2 up
6/14/2015 3:03:00 AM SiteDown C1 and C2 down, low battery
4/6/2015 1:55:00 PM SiteUp C1 and C2 up and running with new batteries
6/26/2014 2:01:00 AM SiteDown C1 down
6/24/2014 11:45:00 PM SiteDown C2 down
4/29/2014 7:00:00 AM SiteUp C1 up
4/10/2014 2:00:00 AM SiteDown C1 down
4/9/2014 3:00:00 PM SiteUp C2 up 
4/1/2014 5:00:00 AM SiteDown C2 down 
3/17/2014 6:00:00 AM SiteUp C1 up at 0600, C2 up at 0700
9/4/2013 7:00:00 PM SiteDown C2 down at 1900, C1 down at 2000
9/4/2013 2:00:00 PM SiteUp C2 up at 1400, C1 up at 1900
7/2/2013 11:00:00 AM SiteDown C2 down
6/21/2013 1:56:38 PM General Initial event log. John Jorgensen (jorj@yakamafish-nsn.gov) is the site data steward. Daniel Russell (rusd@yakamafish-nsn.gov) is technical POC.
5/9/2013 12:00:00 AM SiteDown C1 down
4/17/2013 10:00:00 PM SiteUp C1 and C2 up and running for the first time

Archived Event Logs