Interrogation Site Metadata
GLC - Gold Creek, Methow River
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 1/1/2009 12:00 AM
GLC is a permanent instream PIT tag interrogation site at RKM 0.18 of Gold Creek in the Methow River basin. From Jan. 2009 until Oct. 2015, the site consisted of 3 rows of antennas and was powered by a FS1001M transceiver. The site currently consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of two 10-foot PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MC (MTS). The antennas were built and installed by WDFW. The site is connected to grid power to charge the battery bank powering the detection system. GLC has remote communication abilities provided by a cellular modem and Campbell Scientific CR1000 datalogger. A submersible pressure transducer and temperature probe sensors are also installed to provide environmental condition data collection.
Current Operations
Last File Loaded: | GLC-2024-353-P-002.json |
Date Last File Loaded: | 12/18/2024 9:20 AM |
Date Last File Opened: | 12/18/2024 4:57 AM |
Date Last File Closed: | 12/18/2024 7:57 AM |
Last Observation Tag: | 3DF.0071EB3719 |
Last Observation Date: | 12/14/2024 6:29 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.