Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

EVL - Eagle Valley Ranch - Lower

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 9/21/2019 12:00 AM

Eagle Valley Ranch Lower is located at the downstream end of a restoration zone at Eagle Valley Ranch on the Lemhi River. The site is grid powered and includes six 20’ HDPE pipe-style antennas and IS1001 readers. The readers are connected to an IS1001-MC and cellular remote communications.

Current Operations

Last File Loaded: EVL-2024-109-P-004.json
Date Last File Loaded: 4/18/2024 8:30 PM
Date Last File Opened: 4/18/2024 3:27 PM
Date Last File Closed: 4/18/2024 6:35 PM
Last Observation Tag: 3DD.003DE66AA7
Last Observation Date: 4/18/2024 6:35 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 45.115074, -113.774021  |  River Km: 522.303.416.016

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 9/21/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/5/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments

No Archived Event Logs