Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

EPR - East Fork Potlatch Array

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Year Round
Start Date: 11/13/2019 12:00 AM

The site is located in the East Fork Potlatch River about 3 river kilometers from the confluence with the Potlatch River. The site consists of two rows of antennas with each row containing one 20’ HDPE antenna. A Biomark IS1001-MTS master controller controls the site and is powered by a propane thermoelectric generator providing year-round operations.

Current Operations

Last File Loaded: EPR-2024-115-P-005.json
Date Last File Loaded: 4/25/2024 3:03 AM
Date Last File Opened: 4/24/2024 7:03 PM
Date Last File Closed: 4/24/2024 10:03 PM
Last Observation Tag: 3DD.0077B14E71
Last Observation Date: 4/24/2024 10:03 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Jason Fortier
Jason.fortier@idfg.idaho.gov
208-799-5010

Data Steward:

Brian Knoth
Brian.Knoth@idfg.idaho.gov
208-750-4230

Location

Coordinates: 46.795091, -116.410880  |  River Km: 522.224.024.065.003

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/30/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 12/5/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 11/13/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/25/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments

No Archived Event Logs