Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ENM - Middle Entiat River

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 10/17/2008 12:00 AM
End Date: 6/14/2018 1:00 AM

This is a passive instream interrogation system at Entiat River rkm 26, below the McKenzie Diversion Dam. The system consists of two sets of three antennas. Each set of antennas spans the river; the sets are arrayed in tandem to provide directionality data. Site was removed in October 2018

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Data Steward:

Cutler Dunn
cutler.dunn@merck.com
208-501-4294
Location
Coordinates: 47.797049, -120.403073  |  River Km: 778.026
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/1/2008
End Date:  10/31/2018
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Archived Event Logs