Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ENF - Upper Entiat River at rkm 40.6

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 8/10/2010 12:00 AM
End Date: 9/8/2021 12:00 AM

This is a passive instream interrogation system consisting of two rows of three flat plate antennas spanning across the width of the river. The site is located approximately 600 meters below the beginning of Forest Service Property within the upper portion of the Entiat River at rkm 40.6. Site was removed September 2021.

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 47.901735, -120.466191  |  River Km: 778.041

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021 1/1/2021 12:00 AM 9/8/2021 12:00 AM Site was no longer used for studies and equipment was removed in September 2021.
2020 1/1/2020 12:00 AM 6/10/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/20/2019 12:00 AM 10/22/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 12/19/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM Data from February 17 - March 23 lost.
2010 8/10/2010 12:00 AM 1/1/2011 12:00 AM Start date taken from first file submitted.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/10/2010
End Date:  9/8/2021

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
9/7/2021 1:30:00 PM SiteDown

All equipment was removed from river. 

12/19/2018 2:39:00 PM General Data gap from 12//19/18 to 1/20/19.
1/29/2018 10:59:00 AM General Site visited.
1/18/2018 1:21:00 PM General Replaced cable to antenna #4 and pulled broken temperature probe.
1/17/2018 12:12:00 PM General Plugged antenna #6 back in.
1/17/2018 9:55:00 AM General Site visited.
12/21/2017 11:02:00 PM General Current on antenna #4 is low due to a damage cord. Cord will be replaced in the near future when conditions allow.
12/18/2017 10:15:00 AM General Site visited.
12/12/2017 2:22:00 PM General Site visited. Reset MUX.
12/12/2017 12:00:00 PM SiteUp Site up. Site is back up after reset the battery charger and MUX. Site is now fully operational again.
12/11/2017 10:00:00 AM General Site visited. Reset battery charger.
12/10/2017 12:00:00 PM SiteDown Site down. Site went down due to voltage issues caused by a malfunction battery charger.
12/8/2017 10:07:00 AM General Site visited.
12/6/2017 10:56:00 AM General Antenna #4 was plugged back in. Site is fully operational again.
12/5/2017 10:55:00 AM General Antenna #4 was unplugged due to flows. It will be plugged back in as soon as possible.
11/27/2017 8:29:00 AM General Site visited.
11/23/2017 12:00:00 PM General Water temperature and level probe quit working. Issue will be fixed when a new probe arrives.
11/15/2017 9:05:00 AM General Site visited.
11/2/2017 11:35:00 AM General Site visited.
10/31/2017 6:25:00 PM General Noise alarms on antenna #3. Noise is greater than 90%.
10/31/2017 9:25:00 AM General Site visited. Plugged antenna #4 back in and cleaned debris off cables and antennas. Site is fully operational.
10/30/2017 10:45:00 PM General Low current alarm antenna #4. Antenna #4 was unplugged from 10/30 till 10/31 due to debris.
10/25/2017 11:10:00 AM General Site visited.
10/7/2017 12:00:00 PM General Site visited.
9/28/2017 9:43:00 AM General Site visited.

Archived Event Logs