Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

EFD - East Fork Diversion Fishway

Status:   Active - Operational
Site Type: Adult Fishway  |  Organization: Confed. Tribes of the Warm Springs Reser.
General Operational Period: Year Round
Start Date: 3/9/2016 12:00 AM

The interrogation site is located in a fish ladder at a irrigation diversion site for the East Fork Irrigation District on the East Fork of the Hood River. The ladder is a vertical slot type construction. Two antennas are installed in a pass through configuration at two of the vertical slots at the downstream end of the ladder. At the upstream terminus of the ladder there is an adult trap that is intermittently operated. The fish ladder and interrogation site is operated seasonally cooresponding to the irrigation season (March to October). The antennas are controlled by two synced Biomark IS1001 ACN readers. Power is provided by solar panel(s) charging a deep cycle battery bank. Interrogation data is manually downloaded periodically.

Current Operations

Last File Loaded: EFD-2024-170-P-001.json
Date Last File Loaded: 6/26/2024 3:10 PM
Date Last File Opened: 6/18/2024 1:20 PM
Date Last File Closed: 6/26/2024 10:20 AM
Last Observation Tag: 3DD.0077ADE614
Last Observation Date: 5/14/2024 4:04 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Richard McConville
richard.mcconville@ctwsbnr.org

Data Steward:

Lyman Jim
lyman.jim@ctwsbnr.org
541-553-3587
Location
Coordinates: 45.509403, -121.564780  |  River Km: 273.023.011
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/9/2016
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs