Interrogation Site Metadata
DXP - Dexter Ponds Fish Ladder
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 5/24/2017 12:00 AM
End Date: 4/3/2019 12:00 AM
Detection array located inside the fish ladder leading to Dexter Ponds Fish Hatchery on the north bank of the Middle Fork Willamette River below Dexter Dam. Array consists of two antennas operated by IS1001 nodes communicating through a cell modem. Antennas are placed in-line, with each antenna spanning the full width of the ladder, and designed for pass-through detection. Site is grid powered and operates year-round. Site is on ODFW property. Site is no longer active.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2019 | 1/2/2019 12:00 AM | 4/3/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 12/21/2018 12:00 AM | Start and end dates based on timer tags. |
2017 | 5/24/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | D0 | D1 |
Downstream Antenna | D0 | D2 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
6/15/2017 3:00:00 PM | General | Communication issues with antenna 1. Replaced fiber-optic cable. Issue resolved. |
5/24/2017 3:00:00 PM | SiteUp | Initial installation of antennas 1 and 2. Site fully operational. |