Interrogation Site Metadata
CRU - Upper Chewuch Instream Array
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 7/28/2014 12:00 AM
CRU is a permanent instream PIT tag interrogation site at RKM 28.35 on the Chewuch River. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of three 20-foot PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MC (MTS). The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. CRU has remote communication abilities provided by a cellular modem and Campbell Scientific CR1000 datalogger. A submersible pressure transducer and temperature probe sensors are also installed to provide environmental condition data collection.
Current Operations
Last File Loaded: | CRU-2024-061-P-001.json |
Date Last File Loaded: | 4/2/2024 11:02 PM |
Date Last File Opened: | 3/1/2024 12:41 PM |
Date Last File Closed: | 4/1/2024 11:41 AM |
Last Observation Tag: | 3DD.003DA2904D |
Last Observation Date: | 3/29/2024 2:12 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/1/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/22/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 12/15/2016 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/23/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on timer tags. |
2014 | 7/28/2014 12:00 AM | 12/25/2014 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 01 | 01 |
Upstream Array | 01 | 02 |
Upstream Array | 01 | 03 |
Downstream Array | 01 | 04 |
Downstream Array | 01 | 05 |
Downstream Array | 01 | 06 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
10/14/2014 9:37:25 AM | General | Registered site CRU in PTAGIS. |
7/31/2014 10:00:00 AM | SiteUp | Coils 02 was energized and tuned at this time |
7/28/2014 1:40:00 PM | SiteUp | Coils 01,03,04,05,06 were all energized and tuned at this time |