Interrogation Site Metadata
CRA - Crooked River Array
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 3/16/2022 12:00 AM
Instream array on Crooked River near the confluence with the South Fork Clearwater River consisting of two arrays of antennas and an IS001 master controller. Upstream array has two 20ft antennas and the downstream array has two 20 ft antennas. System is powered by direct AC power to a pair of battery banks.
Current Operations
Last File Loaded: | CRA-2024-330-P-004.json |
Date Last File Loaded: | 11/25/2024 7:00 PM |
Date Last File Opened: | 11/25/2024 3:20 PM |
Date Last File Closed: | 11/25/2024 6:20 PM |
Last Observation Tag: | 3DD.003DFA82D8 |
Last Observation Date: | 11/25/2024 4:11 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.