Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CLE - Cle Elum Dam Interim Bypass

Status:   Active - Operational
Site Type: Juvenile Fish Bypass Facility  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/3/2007 12:00 PM

This site monitors the temporary outlet for the new juvenile fish passage facility (Helix). The site consists of one 7' loop antenna which is mounted on the end of the 7' pipe entering the river at the tailrace of the dam. The temporary outlet pipe will be replaced with a permanent outlet route which is scheduled to be completed in 2025.

Current Operations

Last File Loaded: CLE-2024-130-P-001.json
Date Last File Loaded: 7/2/2024 3:50 PM
Date Last File Opened: 5/9/2024 11:33 AM
Date Last File Closed: 5/28/2024 2:33 AM
Last Observation Tag: 3DD.003E2A8436
Last Observation Date: 5/22/2024 12:53 PM
Detection Summary: Last Day's Observations
Contacts

Data Steward and Primary Contact:

Zack Mays
zack_mays@yakama.com
Location
Coordinates: 47.244248, -121.069359  |  River Km: 539.299.013
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/10/2024
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary
Archived Event Logs