Interrogation Site Metadata
CLC - Clear Creek near Kooskia NFH
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 2/11/2015 12:00 AM
Currently consists of one upstream array located in lower Clear Creek, a tributary to the Clearwater River, just downstream of Kooskia National Fish Hatchery. The upstream portion of the array (CLC) is located at river km 522.224.120.004.001 and consists of one 10-foot Biomark pass-over antenna and two 20-foot Biomark pass-over antennas 55 meters upstream from the hatchery pumping station near the mouth of Clear Creek. The system is powered by a 2 sets of 2 12V batteries powering a Biomark IS1001-MC controller. The unit is currently powered by a solar array, but will be connected to AC power in time. Data is downloaded manually from the MC controller for the time being until remote communication can be set up. Data will then be manually uploaded to PTAGIS through the I5 program. CLC is operated by the Nez Perce Tribe Department of Fisheries Resource Management Research Office located in Orofino, ID. The upstream array went operational on 2/27/2025 and the downstream array was scheduled to be constructed afterwards, but high water prevented installation. The lower array will be installed during the summer of 2025 when low flows are present. The site was originally installed and operated by US Fish and Wildlife Service from 2015 - 2018 as a single row of 5 antennas.
Current Operations
Last File Loaded: | CLC-2025-081-P-001.json |
Date Last File Loaded: | 3/26/2025 7:40 AM |
Date Last File Opened: | 3/22/2025 4:45 PM |
Date Last File Closed: | 3/25/2025 1:03 PM |
Last Observation Tag: | 3DD.003E1219F2 |
Last Observation Date: | 3/25/2025 11:09 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.