Interrogation Site Metadata
CHW - Chiwaukum Creek
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 4/26/2011 6:03 PM
This site is a permanent instream PIT tag detection system located at rkm 0.4 on Chiwaukum Creek (Wenatchee River Basin), located near Tumwater Campground (access through site 51). The site consists of four antennas installed in two rows, each row with two antennas one 20ft and one 10fts, installed in a flat plate configuration. Each row spans the wetted width of the channel during base flows. The antennas were built and installed by WDFW. Power to the IS1001-MC transceiver is provided by a thermoelectric generator on site. Site is operated on a seasonal basis from February to November.
Current Operations
Last File Loaded: | CHW-2024-058-P-001.json |
Date Last File Loaded: | 3/21/2024 8:40 AM |
Date Last File Opened: | 2/27/2024 10:56 AM |
Date Last File Closed: | 3/20/2024 8:56 AM |
Last Observation Tag: | 3DD.003E223819 |
Last Observation Date: | 3/17/2024 4:56 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 9/11/2023 12:00 AM | 11/10/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 7/23/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/5/2021 12:00 AM | 9/11/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 12/14/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | Site down April 5-7. Antenna B5 down June 12-August 16. |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | No reported interuptions in operations. |
2012 | 1/1/2012 12:00 AM | 1/1/2013 12:00 AM | |
2011 | 4/26/2011 6:03 PM | 1/1/2012 12:00 AM | First year of operations. All data from December 1-7 was lost due to a transceiver error. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
UPSTREAM ARRAY | 01 | 01 |
UPSTREAM ARRAY | 01 | 02 |
DOWNSTREAM ARRAY | 01 | 03 |
DOWNSTREAM ARRAY | 01 | 04 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.
Event Date | Event Type | Comments |
---|---|---|
2/7/2024 12:59:00 PM | SiteUp |
Site was turned on for the season. All antennas were working. |
11/22/2023 2:29:00 PM | SiteDown |
Site was turned off for winter and full tanks were staged on 22 November. Site will be restarted in early Spring 2024. |
9/12/2023 10:00:00 AM | SiteUp |
Site down from 6/12/23 to 9/12/23. Site upgraded to IS1001 MC, antennas replaced with HDPE configuration 10,20,10,20 1-4. |
6/6/2023 2:21:00 PM | General |
Antennas 3 and 5 down. High noise on ant 4 and 6. |
2/27/2023 12:00:00 PM | SiteUp |
Restarted site at approximately 12:00 pm 02/27/2023. Site down since 12/01/2022. |
9/20/2022 1:59:00 PM | SiteUp |
Propane was brought to the site. The TEG was restarted and the site is now up and operational. |
8/30/2022 8:00:00 AM | SiteDown |
Site lost Power on 8/30/22 to 9/20/22 antenna 3 is broken |
2/16/2022 3:06:00 PM | SiteDown |
Site was down from 16-25 February as there was no way to get propane to site. |
8/19/2020 1:00:00 PM | General | At interrogation site CHW on 8/19/2020 at approximately 1:00 PM, Antenna #5 was replaced. |
7/24/2019 12:00:00 PM | General | Coax cable to antenna 3 was broken by debris. Coax was replaced and all antennas are working. |
7/17/2018 1:00:00 PM | General | At interrogation site CHW on 7/17/2018 at approximately 1:00 PM, Antenna #6 was brought back online. Antenna #6 was broken and was replaced with an HDPE antenna. All antennas at this site are functioning. Site is fully operational. |
7/24/2017 10:00:00 AM | General | At interrogation site CHW on 7/24/2017 at approximately 10:00 AM, Antenna #6 was replaced. All antennas at this site are functioning. Site is fully operational. |
5/30/2017 3:00:00 PM | General | At interrogation site CHW on 5/30/2017 at approximately 3:00 PM, Antenna #6 lost power. All other antennas are functioning and operational. |
8/19/2016 1:00:00 PM | General | At interrogation site CHW on 8/19/2016 at approximately 1:00PM, antenna #6 was replaced, cable for antenna #5 was replaced, and also cable for antenna # 6 was replaced. All antennas are functioning properly. Site is fully operational. |
3/3/2016 3:35:00 PM | General | At interrogation site CHW, Antenna #6 was reinstalled on 3/3/2016 , but is running at low current. Antenna #6 is not operating at full function. |
3/3/2016 8:57:00 AM | General | At Chiwaukum Creek interrogation site, antennas 1,2,4,5,6 were replaced. Antenna 6 still has low amps, antennas 2 and 5 have high noise. |
1/19/2016 3:00:00 PM | SiteDown | At the CHW interrogation site the thermoelectric generator shut off causing the site to lose power from 1/16/2016 at 10:08 to 1/19/2016 at 12:23. |
11/20/2015 9:21:04 AM | General | At interrogation site CHW antenna #2 lost current on 10/31/15 at 14:58:15. Antennas #1, 4, 5, 6 lost current on 11/17/15 between 16:48 and 18:00. |
6/29/2015 1:27:00 PM | General | No reported interruptions in operations from 7/29/2014-6/29/2015. |
7/29/2014 1:27:00 PM | SiteUp | Site reinstalled after fire danger passed. |
7/17/2014 11:44:26 AM | SiteDown | At approximately 10:00am on 7/17/2014 the CHW interrogation site was shut down and vital equipment and fuel removed due to eminent fire danger. New log event to follow after reinstallation. |
7/16/2014 4:23:08 PM | General | Antenna #B5 was replaced on 7/16/14. It was damaged and full of water. The last report from this antenna was on 6/12/14 at 00:32:19. All antennas at interrogation site are now working. |
4/7/2014 11:24:00 AM | SiteUp | Propane refilled, backup batteries installed |
4/5/2014 11:13:00 AM | SiteDown | Site ran out of propane, site down |
12/31/2013 10:35:00 AM | General | CHW operated without interruption in 2013 |