Interrogation Site Metadata
CCU - Catherine Creek at Union
Status: Active - Non-OperationalGeneral Operational Period: Year Round
Start Date: 12/19/2018 12:00 AM
Instream detection array near the town of Union, Oregon, consisting of a IS1001-MTS multiplexing receiver and four antennas, each with 24v-IS1001s. Two antenna arrays are composed of two antennas each that span the normal high water mark and are secured to the substrate for pass-over detection. Two antennas are placed side-by-side to span the creek for the upstream and downstream arrays. Site is grid powered and operates year-round. Site is on private land.
Current Operations
Last File Loaded: | CCU-2024-356-P-023.json |
Date Last File Loaded: | 12/21/2024 11:20 PM |
Date Last File Opened: | 12/21/2024 10:00 PM |
Date Last File Closed: | 12/21/2024 11:00 PM |
Last Observation Tag: | 724 |
Last Observation Date: | 7/27/2024 4:57 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.