Interrogation Site Metadata
CBL - Clear Branch below the Dam
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 5/3/2016 12:00 AM
End Date: 11/12/2019 12:00 AM
The interrogation site is an instream array in lower Clear Branch located approximately 500m downstream of the Clear Branch Dam. The site uses a single 15 ft PVC cased antenna installed in a pass-over configuration in the tailout of a pool where Middle Fork Irrigation District has a stream gauge. The interrogation site may be operated seasonally or year round depending on winter access and specific needs for monitoring projects or passage studies occurring at Clear Branch Dam. The antenna is controlled by a Biomark IS1001 ACN reader. Power is provided by solar panel(s) charging a deep cycle battery bank. Interrogation data is manually downloaded periodically. Site is no longer active.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.