Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CBL - Clear Branch below the Dam

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Confed. Tribes of the Warm Springs Reser.
General Operational Period: Year Round
Start Date: 5/3/2016 12:00 AM
End Date: 11/12/2019 12:00 AM

The interrogation site is an instream array in lower Clear Branch located approximately 500m downstream of the Clear Branch Dam. The site uses a single 15 ft PVC cased antenna installed in a pass-over configuration in the tailout of a pool where Middle Fork Irrigation District has a stream gauge. The interrogation site may be operated seasonally or year round depending on winter access and specific needs for monitoring projects or passage studies occurring at Clear Branch Dam. The antenna is controlled by a Biomark IS1001 ACN reader. Power is provided by solar panel(s) charging a deep cycle battery bank. Interrogation data is manually downloaded periodically. Site is no longer active.

Contacts

Data Steward:

Patrick Hayden
patrick.hayden@ctwsbnr.org
541-352-4184

Location

Coordinates: 45.461796, -121.652918  |  River Km: 273.023.015.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2019 4/30/2019 12:00 AM 11/12/2019 12:00 AM Start and end dates based on timer tags.
2018 Site not operated due to construction at Clear Branch Dam.
2017 3/31/2017 12:00 AM 9/12/2017 12:00 AM Start and end dates based on event logs.
2016 5/3/2016 12:00 AM 11/30/2016 2:00 PM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  5/3/2016
End Date:  11/12/2019

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
11/12/2019 10:34:00 AM SiteDown Site shut down for the season.
4/26/2019 12:00:00 PM SiteUp Site reinstalled and activated for the season.
9/30/2018 12:00:00 AM SiteDown Site not operated in 2018 due to repairs and construction at Clear Branch Dam and tailrace.
9/12/2017 11:00:00 AM General Site operations ended for the season.
3/31/2017 12:00:00 PM SiteUp Operations initiated at the site for the season.
11/30/2016 2:00:00 PM SiteDown Site operations ended for the season.
5/3/2016 11:00:00 AM SiteUp Site installed and operations began.

No Archived Event Logs