Interrogation Site Metadata
BVX - Bonneville PH1 Juvenile (Exp.)
Status: DecommissionedGeneral Operational Period:
Start Date: 4/26/1996 9:06 PM
End Date: 7/23/2002 2:00 PM
Flat Plate Detector (experimental) at Bonneville Dam PH1 DSM; replaced by B1J
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.