Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BVP - Beaver Creek Acclimation Pond

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 3/23/2006 12:00 AM

Beaver Creek Acclimation Pond, Wenatchee River Basin Site.

Current Operations

Last File Loaded: BVP-2024-095-P-001.json
Date Last File Loaded: 6/13/2024 3:30 PM
Date Last File Opened: 4/4/2024 9:41 AM
Date Last File Closed: 5/30/2024 7:09 AM
Last Observation Tag: 3DD.003E576756
Last Observation Date: 5/30/2024 7:09 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Tim Jeffris
jeft@yakamafish-nsn.gov
509-548-9413 x110

Data Steward:

Jeffrey Caisman
caij@yakamafish-nsn.gov
Location
Coordinates: 47.768224, -120.648222  |  River Km: 754.075.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/2007
End Date:  ----
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs