Interrogation Site Metadata
BTU - Big Timber Creek - Upper
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 8/8/2015 12:00 AM
End Date: 8/1/2018 12:00 AM
This in-stream detection system on Big Timber Creek is located approximately 10.8 km upstream of the confluence with the Lemhi River and is comprised of two arrays. Each array consists of two 10 ft antennas to span the width of the channel. BTM is operated by the Integrated Status and Effectiveness Monitoring Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. This site is powered by a propane thermoelectric generator. Remote communication is provided by a cellular telephone modem. Site was decomissioned in August 2018.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.