Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BTM - Big Timber Creek - Middle

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Year Round
Start Date: 3/19/2015 12:00 AM
End Date: 4/20/2018 12:00 AM

This in-stream detection system on Big Timber Creek is located approximately 5.3 km upstream of the confluence with the Lemhi River and is comprised of three arrays. The upstream array consists of one 10 ft antenna, the middle array consists of two 10 ft antennas, and the downstream array consists of a single 10 ft antenna. BTM is operated by the Integrated Status and Effectiveness Monitoring Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. This site was installed in May 2015 and is powered by a battery bank, which is charged by solar panels. Remote communication is provided by a cellular telephone modem. Site removed May 2018.

Contacts

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 44.660444, -113.377624  |  River Km: 522.303.416.089.005

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2018 1/1/2018 12:00 AM 4/20/2018 12:00 AM Start and end dates based on file created and closed dates. Site removed in May.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on file created and closed dates.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on file created and closed dates.
2015 3/19/2015 12:00 AM 1/1/2016 12:00 AM Start and end dates based on file created and closed dates.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/19/2015
End Date:  5/18/2018

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
5/17/2018 2:00:00 PM SiteDown Site decommissioned
10/30/2015 2:54:52 PM General Registered new interrogation site on Big Timber Creek - BTM

No Archived Event Logs