Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BTC - Big Timber Creek

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period:
Start Date: 2/25/2010 9:50 AM
End Date: 10/15/2013 11:30 AM

This is an instream interrogation system consisting of two 10-foot pass-by antennas arrayed in tandem at km 1.3 on Big Timber Creek. Site was decommissioned October 2013. New site with code BTL was installed 1km downstream and replaces this site.

Contacts

Data Steward:

Cutler Dunn
cutler.dunn@merck.com
208-501-4294
Location
Coordinates: 44.688110, -113.370410  |  River Km: 522.303.416.089.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/20/2010
End Date:  10/15/2013
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs