Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BBP - Blackbird Pond Accl. Site

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 5/7/2013 12:00 AM
End Date: 6/27/2017 12:00 AM

This site is a temporary PIT tag detection system located at rkm 40.1 on the Wenatchee River, near Leavenworth, WA. The detection system consists of two, 24 in diameter antennas affixed to the end of the pond outfall pipe. The outfall pipe extends into the Wenatchee River. Each antenna is powered by an Allflex RM 310 reader, connected to a QST QuBE ACN controller. A 24 VDC battery bank powers the detection system. The antennas were built and installed by WDFW.

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148
Location
Coordinates: 47.588592, -120.664375  |  River Km: 754.040
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/15/2012
End Date:  6/30/2017

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs