Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ANR - Antoine Creek at AV Ranch

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Seasonally
Start Date: 3/16/2021 12:00 AM

Antoine Creek enters the Okanogan River at RKM 99. ANR is located approximately 5 RKM upstream of the mouth of Antoine Creek and placed at the downstream end of a low gradient section of the stream formerly known as Antoine Valley Ranch. The site consists of a single 10 foot HDPE antenna in the pass through orientation, anchored with T-posts, and spans the wetted width at base flows. ANR is solar powered which charges two 12 volt batteries via a Renogy Rover contained within a Jobox, which in turn powers a 12 volt IS1001 reader board connected to a Bluetooth data logger housed within a PVC pod next to the antenna. ANR is a seasonally operated site intended to monitor anadromous fish utilization of the old ranch property as habitat improvements are implemented, specifically adult steelhead spawning distribution.

Current Operations

Last File Loaded: ANR-2024-311-P-001.json
Date Last File Loaded: 11/14/2024 2:20 PM
Date Last File Opened: 11/6/2024 12:03 PM
Date Last File Closed: 11/12/2024 1:21 PM
Last Observation Tag: 3DD.003D53E942
Last Observation Date: 11/11/2024 5:44 PM
Detection Summary: Last Day's Observations
Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030
Location
Coordinates: 48.746841, -119.369198  |  River Km: 858.099.005
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/16/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

No Archived Event Logs