EVENT LOG FOR SITE WSH The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 02/22/2010 14:33 David 12/10/09 - Cold temperature led to problems in hatchery ladder. Water lowered intermittently between 12/10/09 and 2/20/10 for hatchery repairs (1-2 days at a time). During repairs, no fish could pass. 09/08/2009 - Transceiver not communicating with minimon between 09/03 and 09/08, problem fixed and file WSH09251.E was repaired to include data during that time. No data gaps should exist. 02/10/2009 08:26 Jeff 12/09/08 at 12:00 to 02/04/09 at 12:00 - Ladder water turned off due to routine winter hatchery management protocol; therefore, no fish were able to ascend or descend the ladder. All PIT equipment left operating during this nearly two month period. During this time data files were uploaded to PTAGIS. Again, no adult fish were able to utilize the ladder for passage upstream during this time period. 01/27/2009 11:34 Jeff 01/18/09 at 00:01 to 01/21/09 at 11:50 - Site down due to computer problems likely caused by extreme cold temperatures. 01/01/2009 00:00 PTOC_Bot Annual log file initiation for WSH #### End of Event Log for WSH ###