EVENT LOG FOR SITE SR2 Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 10/31/2012 09:35 TARA 9/12/2012 - Batteries were very low. Old V=5.01 Missing data from 09/08/2012 11:55:00 to 09/12/2012 12:44:00 due to power loss 8/9/2012 - CF= good Old V=5.77 Batteries replaced New V= 6.59, 7/26/2012 - File looked good. No voltage taken. 7/12/2012 - CF card looked good, Old V= 6.13 New V= 6.45 6/28/2012 - Changed batteries Old V= 6.09 New V= 6.67 Cf looked good 6/14/2012 - Changed batteries Old V= 6.18 New V= 6.45 Read out Cf card file looked good. Hobo was washed up in shallow water . Allflex was under water ziptied up to bush to keep out of water. 5/31/2012 - Changed batteries Old V= 6.18 New V= 6.55 Read out CF card file looked good. 5/17/2012 - Changed batteries Old V= 5.95 New V= 6.57 Read out CF card file looked good. Antenna under water pulled allflex above water line. 4/26/2012 - V= 5.99 Changed batteries and CF card. New V = 6.76 Downloaded hobo File looked good. Antenna submerged. Flooding more evident than at SR1 4/12/2012 - Hobo downloaded. Hobo moved about 15 feet upstream put in PVC case. V= 6.32 File looked good. 4/6/2012 - Changed batteries and CF card. Old batteries had a voltage of 6.06 and the new batteries had a voltage of 6.77 3/29/2012 - Changed CF card and checked batteries. The voltage was 6.18 3/22/2012 - Changed CF card and batteries. Old batteries measured 6.0V and the fresh batteries measured 6.46V 3/15/2012 - Changed CF card and checked batteries. Voltage was measured at 6.13. 3/8/2012 - Changed CF card and batteries. Old batteries measured 6.06V new batteries were at 6.86V. There was still ice around the antenna. 3/1/2012 - Changed CF card and checked batteries. Voltage measured 6.16. 2/23/2012 - Changed CF Card. Batteries measured 6.10 V. Changed Batteries. New batteries Voltage measured 6.59 V. Photographed lower channel. There was still ice over the lower antenna. 2/16/2012 - Changed CF card. Batteries read at 6.20V's. Bottom of Sanray is still covered in snow and ice. 2/9/2012 - Changed CF card. Batteries read at 5.92V's; changed batteries. New batteries read at 6.41V's. 1/26/2012 - Changed CF card and batteries. The old batteries had a voltage of 6.03 and the new batteries had a voltage of 6.33. 1/19/2012 - Changed CF card and checked batteries. The batteries had a voltage of 6.13. The file looked good 1/12/2012 - Changed CF card and checked batteries. The batteries voltage measured 5.3. The voltage of the fresh batteries was measured at 6.3. File looked good until 12:11 on the 12th. It started inserting squares in the data lines. (loss of power). The new file was added to the end of SAN12012.SR2 on the N drive. Batteries aren't allowed below 5.5V anymore. 1/6/2012 - Changed CF card. Timer tag was working properly. 1/5/2012 - Test tag wasn't working. Moved the tag to a better configuration and set to a 1 minute timer interval. Test tag still not working. Installed the test tag that was removed from Wilson Lower site. The test tag from Wilson Lower site worked. The tag was set to 1 minute intervals. The tag was successfully recorded on the Acumen at the 1 minute interval. Set the timer tag to 1/4 second reveal and 31 minute interval. Deployed HOBO 1/3/2012 - Changed CF card and checked the batteries. The voltage measured 5.75. Recovered the Hobo. After reviewing the files it appears that the test tag wasn't working. 10/31/2012 09:29 TARA 12/16/2011 - Changed the CF card and checked the batteries. The voltage measured 5.15. The batteries were exchanged the voltage on the new batteries measured 6.22. Tested timer tag by manually firing it. The timer tag was working. 12/8/2011 - Changed CF card and checked the batteries. The voltage measured 5.78. Changed file name in the Acumen to SANXXXXX.SR2 and changed the time stamp to MM/DD/YYYY, hh:mm: ss.SR2. 12/1/2011 - Changed CF card and checked batteries. The voltage measured 5.8. The time and date were checked in the Acumen. Both were correct. The toggle messages function in the Acumen was turned on. 11/23/2011 - Changed the CF card and checked the batteries. The voltage measured 5.6. The batteries were exchanged. The voltage on the fresh batteries measured 6.0 11/17/2011 - Changed the CF card and checked the batteries. The voltage measured 5.9. 11/10/2011 - Changed CF card and checked the batteries. The voltage measured 6.08 11/4/2011 - Changed CF card and checked the batteries. The voltage measured over 6.0 10/20/2011 - Changed the CF card and checked the batteries. The batteries were exchanged. The voltage on the fresh batteries measured 6.15. 10/15/2011 - Changed CF card and checked the batteries. The voltage measured 6.09. 10/6/2011 - Time and date; file name set. 10/5/2011 - Site installed. 10/30/2012 11:05 Nicole Initial event log for new interrogation sites SR1 and SR2. Tom Desgroseillier (Tom_Desgroseillier@fws.gov) is the site's data steward. Tara Taylor (Tara_Taylor@fws.gov) is the technical POC. ####End of Event Log for SR2###